Home › Blog › Automating weekly reports
Automating the weekly report — template and prompt included
Weekly reports automate better than meeting notes, because the structure is a person re-transcribing information that already exists somewhere. Here is the structure and the prompt, in full.
Template included Prompt published Repeats weekly
The short answer
Most of the time spent writing a weekly report is not thinking time — it is gathering time. Finding what happened last week, reformatting it, and re-checking the numbers. Those three steps are the automation target.
Based on Divii Consulting engagements, automating meeting notes and weekly reporting cut document work by 70%. Weekly reports repeat on a fixed day in a fixed format, which makes them one of the better-conditioned automation targets there is.
The structure — three stages
A prompt you can use as-is
The prompt below has three devices in it, for format stability and to prevent invention: it specifies the order of sections, it makes unsupported items stay blank, and it derives next week’s plan from last week’s unfinished items.
Prompt: "Draft a weekly report from the following raw material. Fix the format in this order: (1) completed this week (2) in progress (3) next week’s plan (4) issues and requests. Write each item on one line with the owner in parentheses. Never guess or fill in anything not supported by the raw material — leave that section blank instead. Use only figures present in the raw material, and where a calculation is needed, show the calculation. Derive ‘next week’s plan’ primarily from in-progress items and last week’s unfinished items."
The weekly report template
| Section | Content | Writing rule |
|---|---|---|
| Completed this week | Work finished and its outcome | One-line summary plus owner. Include the resulting figure where there is one |
| In progress | Progress and expected completion | Never estimate progress — state it only where the raw material has it |
| Next week’s plan | Three to five items, in priority order | Derived from in-progress and unfinished items |
| Issues and requests | What is blocked and what decision is needed | Name who the request is directed at. Leave blank if none |
Where it commonly fails
How far a tool alone gets you
If there is one place to collect from and a person can copy and paste it, a free summarisation tool is enough. Five to ten minutes a week.
If there are three or more sources, or a draft has to arrive automatically at the same time every week, you need a build. That is where integration with collaboration tools and dashboards enters, and it is the line between a tool and a pipeline.
Frequently asked questions
Can we use the prompt exactly as written?
You can. But after the first week, rename the sections to your own internal terminology. Using words the reader already knows cuts review time further.
What if a number comes out wrong?
That is why the prompt includes "use only figures present in the raw material" and "show the calculation". With the calculation left in, the review step catches it in five seconds.
Teams use different formats — do we have to standardise?
Better to, but not essential. Keep a separate prompt per team. Once you pass about five prompts the management burden appears, and that is the point to consider standardising.
Can reporting up the chain be automated too?
Once team reports accumulate in a fixed location, aggregating them into a department draft follows. But reporting upward involves interpretation and judgement, so a draft is the realistic limit.
Try it on this week’s report
Past three collection sources, you are into a build
Tell us where the raw material for your weekly report is scattered and we will separate what a tool can do from what needs building.
SurfingBear